Project opportunity that passed initial screening · Water, waste and climate

W06Package category BReady to purchase

Regional flood-risk reduction portfolio

The portfolio combines flood protection for settlements, intervention prioritisation and preparation of the first phase. Benefits are assessed through risk reduction and avoided damage; the funding source is established separately.

Regional flood-risk reduction portfolio
Purchased package level

Extended · Package category B

Actual package readiness

Ready to purchase

Recommended geography

A pilot region in northern, western or central Kazakhstan

Proposed buyer or payer

A water or waste operator, industrial customer, local authority or environmental investor; the contractual counterparty is determined with the site

Source-data base date

11.10.2026

Package version

V1

Release date

10/11/2026

Indicative investment in the facility

Established within the package after capacity, technology, site and external infrastructure are clarified.

Investment thesis

Why the opportunity passed initial screening

The portfolio combines flood protection for settlements, intervention prioritisation and preparation of the first phase. Benefits are assessed through risk reduction and avoided damage; the funding source is established separately.

Commercial premise

Who is expected to create demand for the product or service

Expected buyers or payers: A water or waste operator, industrial customer, local authority or environmental investor; the contractual counterparty is determined with the site. The revenue model, contractual structure and validated demand volume are refined while preparing the purchased package.

Development history

2025 · Concept stage

Through its internal initiative programme, ALMECO explored the idea, potential applications and preparation for further project development.

2026 · Pre investment product development

The concept is developed into a pre investment package covering engineering options, financial scenarios, risks and a programme to validate the inputs.

Document release date and actual package readiness are stated separately on this page. Preliminary development does not mean construction or commissioning of a facility.

What this page already discloses

Project starting assumptions

01

Current state of source development

The package has passed internal quality control and can be delivered within the timing confirmed before payment.

02

Planned output of the purchased package

Extended · The exact list, calculation depth and issue date are fixed in the invoice or agreement before payment.

03

Critical point to validate

The programme owner mandate, hydrological calculations, land rights and funding source remain unconfirmed. Avoided damage is not operator cash revenue.

04

Next validation before proceeding

Obtain the mandate, flood records and an exposed asset map; verify design water levels, alignments and land; compare protection options and establish funding for the first phase.

Project page standard

Core sections of the pre-investment work

01

Engineering concept

Configuration, recommended capacity, principal process units and preliminary resource balances.

Refined in the purchased package
02

Capital and operating costs

Capital and operating cost ranges with estimate basis, contingency, taxes, inclusions and exclusions.

Refined in the purchased package
03

Indicative economics

Revenue, utilisation, break-even and sensitivity scenarios only when demand and pricing evidence is sufficient.

Refined in the purchased package
04

Site and infrastructure

Land criteria, access, logistics, water, power, utilities, sanitary and environmental constraints.

Refined in the purchased package
05

Feedstock, people and suppliers

Project requirements, availability of critical resources and conditions to validate before the next stage.

Refined in the purchased package
06

Stages and permitting route

Decision sequence, responsible parties, key approvals, risks and briefs for subsequent development.

Refined in the purchased package

Planned product scope

Package category B · Extended

Principal sections of ready package version V1

This is the released version scope. The file list, language, use rights and delivery timing are confirmed before payment.

  1. 01

    Project passport and investor decision brief

  2. 02

    Extended market, demand and competition review

  3. 03

    Comparison of preferred regions and site criteria

  4. 04

    Engineering concept, capacity and infrastructure needs

  5. 05

    Capital and operating cost structure

  6. 06

    Financial scenarios, break-even and sensitivity

  7. 07

    Permitting action map and risk register

  8. 08

    Roadmap and briefs for the next stage

Delivery process

The buyer knows the product status, scope and limits before purchase

  1. 01

    Documents in Russian or English, selected before payment

  2. 02

    Editable neutral templates with fields for the buyer’s details

  3. 03

    Price, version, scope, timing and use rights confirmed before invoicing

  4. 04

    After full payment, the agreed version is delivered through a protected link

After purchase

What the buyer does next

  1. 1

    Selects a specific site and validates source data

  2. 2

    Performs independent legal, tax and commercial due diligence

  3. 3

    Commissions project-specific feasibility, surveys and design

  4. 4

    Secures land, utility conditions, approvals and financing

Next step

Request the exact scope and preparation schedule for this package

Before invoicing, we confirm the category, actual status, language, territory, scope, timing, price and use rights.

Ready-package price9 800 000 ₸Request the full package scope

A separate ALMECO service

If the project is a good fit, the next stage may be to prepare it for a specific site.

ProjectHub helps the buyer select a project idea and assess the starting conditions. Under a separate agreement, ALMECO develops sketch designs, technical briefs and pre-design packages for a specific project.

Pre-design preparation by ALMECO