Project opportunity that passed initial screening · Water, waste and climate

W07Package category BUnder preliminary assessment

Citywide stormwater master plan

The concept addresses water scarcity, network losses, safe waste management or resource recovery. Its market case depends on measured flows and a workable payment mechanism.

Illustrative image of water and materials-recovery infrastructure
Purchased package level

Extended · Package category B

Actual package readiness

Under preliminary assessment

Recommended geography

Almaty, Astana, Shymkent or a regional capital

Proposed buyer or payer

A water or waste operator, industrial customer, local authority or environmental investor; the contractual counterparty is determined with the site

Source-data base date

24.08.2026

Indicative investment in the facility

Established within the package after capacity, technology, site and external infrastructure are clarified.

Investment thesis

Why the opportunity passed initial screening

The concept addresses water scarcity, network losses, safe waste management or resource recovery. Its market case depends on measured flows and a workable payment mechanism.

Commercial premise

Who is expected to create demand for the product or service

Expected buyers or payers: A water or waste operator, industrial customer, local authority or environmental investor; the contractual counterparty is determined with the site. The revenue model, contractual structure and validated demand volume are refined while preparing the purchased package.

What this page already discloses

Project-specific starting assumptions

01

Current state of source development

A project-specific short page is published. The full package is not yet open for sale; buyers may register interest and influence the preparation queue.

02

Planned output of the purchased package

Extended · The exact list, calculation depth and issue date are fixed in the invoice or agreement before payment.

03

Critical point to validate

Principal stop factors are unverified water or waste flows, variable quality, land and sanitary-setback constraints, weak offtake and the absence of a committed payer.

04

Next validation before proceeding

Select the site and source stream; measure volume and composition, verify land and infrastructure, and obtain evidence of product offtake or willingness to pay for the service.

Project page standard

Core sections of the pre-investment work

01

Engineering concept

Configuration, recommended capacity, principal process units and preliminary resource balances.

Refined in the purchased package
02

Capital and operating costs

Capital and operating cost ranges with estimate basis, contingency, taxes, inclusions and exclusions.

Refined in the purchased package
03

Indicative economics

Revenue, utilisation, break-even and sensitivity scenarios only when demand and pricing evidence is sufficient.

Refined in the purchased package
04

Site and infrastructure

Land criteria, access, logistics, water, power, utilities, sanitary and environmental constraints.

Refined in the purchased package
05

Feedstock, people and suppliers

Project requirements, availability of critical resources and conditions to validate before the next stage.

Refined in the purchased package
06

Stages and permitting route

Decision sequence, responsible parties, key approvals, risks and briefs for subsequent development.

Refined in the purchased package

Planned product scope

Package category B · Extended

What the selected category package will contain

The exact list, calculation depth and issue date are fixed in the invoice or agreement before payment.

  1. 01

    Project passport and investor decision brief

  2. 02

    Extended market, demand and competition review

  3. 03

    Comparison of preferred regions and site criteria

  4. 04

    Engineering concept, capacity and infrastructure needs

  5. 05

    Capital and operating cost structure

  6. 06

    Financial scenarios, break-even and sensitivity

  7. 07

    Permitting action map and risk register

  8. 08

    Roadmap and briefs for the next stage

Delivery process

The buyer knows the product status, scope and limits before purchase

  1. 01

    Documents in Russian or English, selected before payment

  2. 02

    Editable neutral templates without ALMECO branding or contacts, with fields for the buyer’s details

  3. 03

    Price, version, scope, timing and use rights confirmed before invoicing

  4. 04

    After full payment, the agreed version is delivered through a protected link

After purchase

What the buyer does next

  1. 1

    Selects a specific site and validates source data

  2. 2

    Performs independent legal, tax and commercial due diligence

  3. 3

    Commissions project-specific feasibility, surveys and design

  4. 4

    Secures land, utility conditions, approvals and financing

Next step

Request the exact scope and preparation schedule for this package

Before invoicing, we confirm the category, actual status, language, territory, scope, timing, price and use rights.

Indicative preparation price from9 800 000 ₸Request the full package scope